Views: 0 Author: Site Editor Publish Time: 2020-04-14 Origin: Site
Mobile style in Xinjiang Gillebruck Hydropower StationDiesel generator setsIn the subsidiary equipment procurement project, our company wins the bid and provides a 200kwChongqing Cummins generator set, Xinjiang Gille Black Hydropower Station has officially started, marking the development of the Haba River Basin Regional Development Entering. Gillebrak Hydropower is the third level of the Taxi River, which is the first-grade tributary Haba River, controlling the area of 6056km2, and the reservoir has a total storage capacity of 2.32 billion m3, and the total installed capacity is 140,000 kW. The project is mainly composed of concrete panels, deep hole flooding holes, overflowing holes, overflowing holes, and buildings such as power generation, and power plant, total investment of 121,400 million yuan. Throughout the consultation Gu Xiaobing, 1899953146, 13809953146, 13609915083.