Diesel generator sets must be operated by personnel who are familiar with the unit structure and master safety operation procedures. New or just underwater diesel engine groups should be operated over 60 hours according to regulations and do the necessary maintenance.
For new or long-standing generators, they must have been strictly inspected before investing properly, mainly checking the insulation of windings, wiring conditions, etc. If any, it is necessary to handle it.
After the diesel engine starts, slowly improve the speed. If you check it, you can perform a low-speed to the no-load operation of the rated speed. At the time of air-load operation, the oil pressure is highly inspected, there is no abnormal, excitation current, three-phase voltage change, etc. If there is abnormal situation - should be closed immediately. After the situation is found, start it again. If everything is normal, you can run normally. The operator should strictly monitor the change of the instrument on the control screen, whether the scope is permitted and adjusted accordingly.
When operating, the operator should maintain a safe distance with the charging equipment and wear labor protection equipment. The turning operation should pay attention to the order. If the power outage should be disconnected first, then disconnect each branch switch, then disconnect the total switch, and then perform the four-pole double throttle switch. When power is delivered, the sequence is reversed. Normal downtime should first remove partial load, then break the total switch, ZUI rear clearance diesel engine, not allowed to break the total switch, and power out of the diesel machine. After the stop, the unit is routinely inspected, and the operation is recorded (working diary).
In case there is any electric shock, the power switch should be quickly cut, or the power supply is quickly broken or separated from the power supply with the insulating appliance. Then to rescue and ask the doctor to live rescue. When in case of the water disaster with electrical equipment, the power supply should be cut off immediately and report the local power supply, and then fire. For the charged equipment, the fire extinguisher, carbon dioxide fire extinguisher, etc., is not allowed to use water.
Jiangsu Xingguang Power Equipment Co., Ltd. has test equipment, advanced production technology, professional manufacturing technology, perfect quality management system, strong research and development technology strength, with 64 sales service department, ready to provide users with diesel generator set equipment installation , Debug, repair a dragon service.