When the relay is inspected or regularly inspected, the following external check should be performed:
1. The relay housing should be intact, the cover and the base are sealed, mild and reliable. 2. Each original should not have trauma and damage, and the installation is firm and neat. 3, the screws, terminals, and connecting wires of the conductive portion should not be oxidized, soldering and adverse contact, and the screws and wiring columns should have spacers and spring sheets. 4, non-conductive parts, such as springs, limit rods, etc., must be specified by screws and seal with a durable paint point. The above information is described in the Technical Department of Xinjiang Starlight Generator. Official website:Www.xjxgdl.com. Our company can sell 1KW-3000kWGasoline generator setHigh and low pressureDieselHotline: 400-0991036