Test Process Process of Xinjiang Starlight Generator Set
Views: 0 Author: Site Editor Publish Time: 2013-04-01 Origin: Site
Position placed in place - → Connect the engine into the oil pipe - → Fuel system emission air - → → → → Fusion CF15W / 40 grade oil - → Connect Engine Load Cables and Test Instruments - → Check if there is a missed, leakage and leakage phenomenon - → Clear parts, tools, debriss that throw away from any floating in the unit - → willunitPower switch is placed in a switching position - → connect the battery and battery cable, the unit exhaust exit is connected to the process muffler (exhaust pipe) - → Engine pre-lubrication - → Check unit control alarm system Whether it works well - → engine mill Rated speed is idling 3 minutes - → 25%, 50%, 75% rated load operation 3 minutes then add to rated load - →unitTest (according to the test item table) - → Full load of 20-30 minutes (sundown water temperature stability) - → load 110% (necessary) Run 10 minutes - → Disconnect the power switchgers in the end of the test for 3 minutes to stop operation - → Machine group finishing - → unpacking and process muffler (exhaust pipe) connection - → Remove into oil pipe, load cable and test meter - → put clean radiator cooling water and engine oil (after cooling) - → Clean Units - → Blocking into the back oil pipe - → cover (seal) the exhaust port (seal). For details, please contact our company after-sales service department: 0991-3856119, 0991-3817210, 0991-3814032, 0991-3814032, 400-0991036