 +8618999222000  875491817@qq.com
Homepage / news / Technical Support / Test Process Process of Xinjiang Starlight Generator Set

Test Process Process of Xinjiang Starlight Generator Set

Views: 0     Author: Site Editor     Publish Time: 2013-04-01      Origin: Site

Position placed in place - → Connect the engine into the oil pipe - → Fuel system emission air - → → → → Fusion CF15W / 40 grade oil - → Connect Engine Load Cables and Test Instruments - → Check if there is a missed, leakage and leakage phenomenon - → Clear parts, tools, debriss that throw away from any floating in the unit - → willunitPower switch is placed in a switching position - → connect the battery and battery cable, the unit exhaust exit is connected to the process muffler (exhaust pipe) - → Engine pre-lubrication - → Check unit control alarm system Whether it works well - → engine mill Rated speed is idling 3 minutes - → 25%, 50%, 75% rated load operation 3 minutes then add to rated load - →unitTest (according to the test item table) - → Full load of 20-30 minutes (sundown water temperature stability) - → load 110% (necessary) Run 10 minutes - → Disconnect the power switchgers in the end of the test for 3 minutes to stop operation - → Machine group finishing - → unpacking and process muffler (exhaust pipe) connection - → Remove into oil pipe, load cable and test meter - → put clean radiator cooling water and engine oil (after cooling) - → Clean Units - → Blocking into the back oil pipe - → cover (seal) the exhaust port (seal). For details, please contact our company after-sales service department: 0991-3856119, 0991-3817210, 0991-3814032, 0991-3814032, 400-0991036

Urumqi Cummins Electromechanical Equipment Co., Ltd.
Urumqi Cummins Electromechanical Equipment Co., Ltd.
a professional production of generators.
Dieselgenerators Diesel generator setsManufacturers, Supply Cummins generator sets, Yuehai generator sets, Yuchai generator sets.
Brand generator set recommended
Contact Us
Address:Room 2-4-602, Jiafengyuan Community, No. 305, Beijing North Road, Urumqi, Xinjiang
Contact: Gu Xiaobing
Managed Office: +86-0991-3817210 +8618999222000
Sales: +86-0991-3814032 +8618609915083
Three packs: +86-0991-3814032 +8617704919966
Website:
www.xjxgdl.com
mailbox: 3481400475@qq.com
Copyright ©Urumqi Cummins Electromechanical Equipment Co., Ltd. New ICP No. 17000509 -1