Six points of points needed when the diesel generator set is installed
Views: 0 Author: Site Editor Publish Time: 2015-04-12 Origin: Site
Installation requirements: 1. The diesel generator should be not less than 1 meter space, and the water tank is returned to the ventilation window according to the water tank core. This requirement is the minimum size of the unit computer room, and users can increase as needed.
2. The foundation of diesel generator sets should be built on the hard soil ground. After consolidation, do 200mm thick concrete ground, and the ground should be flat.
3. When the user builds a machine room, it should be pre-buried on the bucket of the hanger (≤250kW or less) to prepare for future repairs.
4, the machine room should be well ventilated, the ground should be flat, non-slip.
5, the inner diameter of the unit exhaust pipe should not be smaller than the diameter of the diesel exhaust port, the elbow should not exceed 3, the angle of elongation should be greater than 90 degrees, the exhaust pipe should have support or lifting brackets, ensure the unit silencer, supercharger, etc. Unrestrained.
6, the fire fighting tool such as fire extinguishers should be provided in the machine room.