Precautions when the diesel generator set is turned on
1. Preparation before booting
1 removes the waters, oils and iron embroidery of the attachment unit.
2 The units of the unit are fully patrolled, check whether each connection, fastening and steering parts are firmly fixed, tandem shock absorber (ie fastening bolts pass through the bottom foot shock pad and chassis) nuts Do not screw too tight (ie, the nut is rotated to the position of the foot, at this time, the two nuts must be locked to each other to prevent looseness), otherwise the damping is invalid.
3 Check if the fuel storage in the fuel tank is met.
4 Check if the diesel oil shell and the injector pump are sufficient.
5 is filled with water tank (ie radiator).
6 Check all electrical parts, each contact should be firm and correct, the automatic air switch should be in the \"disconnection \" location, check whether the battery can work properly and pay attention to the start system is generally negative.
7 When the unit is intermittent, it must first use a 500V megapherometer to measure the insulation resistance of the generator's windings and control system on the ground. If the temperature is not less than 2 mega, if the insulating resistance is below the above value, it must be carried out Dry treatment.

2, boot step
1 Release the deflation screw on the injection pump, exclude the air within the fuel system with a fuel hand, while securing the adjustment control handle in the throttle position suitable for starting the speed.
2 Press the generator start button to activate the diesel engine, such as 10 seconds (up to 15 seconds)
The diesel engine still can't be fired, and after 1 minute, make the second start. If it is still unable to start continuous three times, it should be checked and identified.
3 After the diesel engine is started, it should pay close attention to the oil pressure gauge reading (2.5-3.5kg / cm2 of normal operation), such as the oil pressure gauge does not indicate, should be closed immediately, and check the current table without charging instructions.
4 After the diesel generator is started, the no-load speed gradually increases to 1000-1200r / min, (note that the long-term low speed operation), after the diesel engine's preheating process, the speed is increased to the rated speed. The full load operation is allowed when the water temperature reaches 55 ° C, and the oil temperature reaches 45 ° C.
5 When the instrument is indicated in the unit, it can be incorporated with the load switch to the load, and the frequency and voltage should be adjusted in time, if the frequency and voltage are not within the specified range, it should be adjusted in time to keep the rated value, strictly forbidden The unit is loaded under low speed to avoid damage to the equipment.
6 After the diesel generator unit is in normal operation, it should be observed at any time to observe the change of water temperature, oil temperature, hydraulic pressure and the readings of the power meter, frequency table, current meter, and voltmeter, and find abnormalities should be handled in time.

Our company has testing equipment, advanced production technology, professional manufacturing technology, perfect quality management system, strong research and development technology, with 64 sales service department, ready to provide users with diesel generator set equipment installation, commissioning, maintenance Train services.
Our company sells all the year round of Pains, Cummins, Volvo, Shangchai, Yuchai, and Weichai, etc. throughout the country, and provides after-sales service. Service Hotline: 0991-3856119 0991-3817210 0991-3814032 13809953146 18999222000 18609915083 4000991036


Urumqi Cummins Electromechanical Equipment Co., Ltd.
Urumqi Cummins Electromechanical Equipment Co., Ltd.
a professional production of generators.
Dieselgenerators Diesel generator setsManufacturers, Supply Cummins generator sets, Yuehai generator sets, Yuchai generator sets.
Brand generator set recommended
Contact Us
Address:Room 2-4-602, Jiafengyuan Community, No. 305, Beijing North Road, Urumqi, Xinjiang
Contact: Gu Xiaobing
Managed Office: +86-0991-3817210 +8618999222000
Sales: +86-0991-3814032 +8618609915083
Three packs: +86-0991-3814032 +8617704919966
Website:
www.xjxgdl.com
mailbox: 3481400475@qq.com
Copyright ©Urumqi Cummins Electromechanical Equipment Co., Ltd. New ICP No. 17000509 -1