Views: 0 Author: Site Editor Publish Time: 2020-04-14 Origin: Site
Daily inspection work steps for Volvo Engines:
Diesel generatorsThe operator should develop the habit of doing \"intuitive check \" to the entire generator room before and after the operation is started before starting the engine. This helps to find abnormalities that have occurred and will occur in a timely manner, and solve the abnormal problems in advance to avoid significant losses.
Pay special attention to the looseness of bolts, lubricating oil, fuel, and coolant leakage, belt wear or slack, linked lump or damage to the hose and cable. Checking these items only require a few minutes, but avoid serious damage caused by major downtime or expensive repairs.
Warning tips! The fuel, lubricant or grease accumulated on the engine or in generator room is a fire hazard, once found, immediately removed.
Important! If you find that there is a lubricant, fuel or coolant leak, you must find why, and exclude problems before starting the engine.
Important! When flushing with high pressure water guns, remember: Do not align the water column to the seal, rubber hose or electrical components.
Jiangsu Xingguang Power Equipment Co., Ltd. was founded in 1974 and is one of the earlier manufacturers of domestic generator sets. There is a 64 sales service department in the country, which is ready to provide design, supply, commissioning, and repair a dragon service for users. Since 1982, the company has always been the\"National Internal Combustion Engine Generator Group Quality Supervision and Inspection Center\". At the end of 2001, the product quality passed ISO9001 standard certification. The Xinjiang Office of the Company was established in 1995 and has long-term imports, joint ventures, domestic diesel generators and spare parts for the majority of customers for 30KW-2000KW. support hotline:18999222000!